Asphalt Paving Along New Curb & Gutter
Paver laying hot mix asphalt fed by an end-dump truck, working tight against freshly poured concrete curb and gutter.
A selection of civil construction and infrastructure projects delivered across Southern California.
Paver laying hot mix asphalt fed by an end-dump truck, working tight against freshly poured concrete curb and gutter.
CAT cold planer grinding existing asphalt to grade ahead of resurfacing, with live truck loading on a commercial corridor.
CAT PM312 milling machine conveying grindings directly into dump trucks with E&M crew coordinating traffic control.
CAT skid steer with broom attachment sweeping the milled roadway clean ahead of tack coat and paving.
Self-performing E&M crew placing hot mix asphalt with paver and end-dump on a wide municipal street.
Ride-on roller compacting fresh asphalt within a coned work zone on an active Los Angeles transit corridor.
.jpg&w=3840&q=75&dpl=dpl_8adCMeiU8ia4rewtPYMef2P6xnvL)
Full-depth asphalt resurfacing of residential and arterial streets including paving machine operation, roller compaction, and thermoplastic re-striping.
.jpg&w=3840&q=75&dpl=dpl_8adCMeiU8ia4rewtPYMef2P6xnvL)
Parking lot rehabilitation with fresh asphalt overlay, compaction, and new painted stripe lines for commercial facility.
.jpg&w=3840&q=75&dpl=dpl_8adCMeiU8ia4rewtPYMef2P6xnvL)
Machine-formed concrete curb and gutter installation using a low-deck slip-form paver through residential alleys, delivering consistent profile and rapid production.

Open-cut trench excavation with OSHA-compliant shoring for conduit and pipe installation in residential right-of-way, with full surface restoration.
.jpg&w=3840&q=75&dpl=dpl_8adCMeiU8ia4rewtPYMef2P6xnvL)
Crane-set placement of precast concrete vault sections and lids into shored excavations for underground utility infrastructure.
.jpg&w=3840&q=75&dpl=dpl_8adCMeiU8ia4rewtPYMef2P6xnvL)
Concrete pathway and curved sidewalk construction at a public park, including rebar-reinforced formwork, pour, and broom finishing.
.jpg&w=3840&q=75&dpl=dpl_8adCMeiU8ia4rewtPYMef2P6xnvL)
Construction of ADA-compliant corner ramps with fresh concrete and yellow detectable warning (truncated dome) tiles at residential intersections.
.jpg&w=3840&q=75&dpl=dpl_8adCMeiU8ia4rewtPYMef2P6xnvL)
Street base preparation and sub-grade work adjacent to Griffith Park using CAT skid steer and dump trucks, with new concrete curb installed on right of way.
.jpg&w=3840&q=75&dpl=dpl_8adCMeiU8ia4rewtPYMef2P6xnvL)
Concrete retaining wall with metal handrail adjacent to a park basketball court, including rebar cage, formwork, pour, and steel rail installation.
.jpg&w=3840&q=75&dpl=dpl_8adCMeiU8ia4rewtPYMef2P6xnvL)
Full intersection asphalt paving operation near Western Ave with E&M paver machine, CAT skid steer for joint work, and finishing crew.
.jpg&w=3840&q=75&dpl=dpl_8adCMeiU8ia4rewtPYMef2P6xnvL)
Full alley resurfacing with fresh black asphalt and a concrete center gutter/drainage strip running the length of the alley.
.jpg&w=3840&q=75&dpl=dpl_8adCMeiU8ia4rewtPYMef2P6xnvL)
Installation of street light pole bases and pedestrian crossing signage, including anchor bolt placement in wet concrete and underground conduit runs.
Ready to Start Your Project?
We respond within 1 business day · Mon–Fri 7 am–5 pm